Immediate entire-scale load tests ended up performed at reasonably small Charge, fostering the acquisition and publication of a prosperity of testing data. No grout/floor bond failures have been recorded during these early tests.Bar with a Hollow Micropiles are drilled into the earth employing a sacrificial drill/grout tip even though strain grout